SBI Term Loan: RLLR: 8.15 | 7.25% - 8.45%
Canara Bank: RLLR: 8 | 7.15% - 10%
ICICI Bank: RLLR: -- | 8.5% - 9.65%
Punjab & Sind Bank: RLLR: 7.3 | 7.3% - 10.7%
Bank of Baroda: RLLR: 7.9 | 7.2% - 8.95%
Federal Bank: RLLR: -- | 8.75% - 10%
IndusInd Bank: RLLR: -- | 7.5% - 9.75%
Bank of Maharashtra: RLLR: 8.05 | 7.1% - 9.15%
Yes Bank: RLLR: -- | 7.4% - 10.54%
Karur Vysya Bank: RLLR: 8.8 | 8.5% - 10.65%

Asset class : Infrastructure

Centre approves INR 1,880 crore NH-66 expansion project for Cuncolim-Bendordem stretch in Goa

29 May 2026

The Centre has cleared an INR 1,880.11 crore project to widen the Cuncolim-Bendordem stretch of NH-66 in South Goa, strengthening a key highway corridor connecting Goa with Karnataka and Maharashtra. The project includes four-laning works, a 5.78-km elevated corridor, bypasses at Cuncolim and Balli, a six-lane railway overbridge, upgraded junctions and pedestrian infrastructure. The development is aimed at reducing congestion, improving travel time and supporting rising traffic movement across South Goa. The approval also adds to ongoing highway expansion works being undertaken on different sections of NH-66 along India’s western coastal corridor.Read more

cover photo

Government approves INR 1,427 crore Thiruvarur bypass project in Tamil Nadu

29 May 2026

The Ministry of Road Transport and Highways has approved a 4-lane Thiruvarur bypass project in Tamil Nadu with an estimated cost of INR 1,427.61 crore. The 14.9 km stretch on NH-83 will also include two Road Over Bridges on NH-129A and NH-134A. The project is expected to improve connectivity between Tiruchirappalli, Coimbatore, Karaikal, and Nagapattinam, while easing traffic congestion in Thiruvarur town. It is also likely to reduce travel time and improve safety by diverting heavy traffic away from populated and commercial zones in the region.Read more

cover photo

BMC tables final tree-cutting proposals for Versova–Dahisar Coastal Road project

Mumbai News Desk

29 May 2026

• The Brihanmumbai Municipal Corporation has submitted six final proposals involving cutting and transplantation of over 2,200 trees for the Versova–Dahisar Coastal Road project in Mumbai’s western suburbs.
• According to civic documents and multiple media reports, nearly 1,000 trees are proposed to be cut while around 1,288 trees are planned for transplantation across stretches between Goregaon, Malad and Dahisar.
• The civic body stated that compensatory plantation of more than 19,500 trees will be undertaken in Panvel due to limited plantation space available within Mumbai.
• The proposals have been placed before BMC’s Tree Authority amid opposition from residents and environmental groups over potential green cover loss and mangrove impact linked to the coastal road project.
Read more

cover photo

SBI outlines digital-first growth strategy aligned with India’s Viksit Bharat vision

29 May 2026

State-owned State Bank of India has said the banking sector will play a key role in supporting India’s long-term economic growth, infrastructure expansion, entrepreneurship, and financial inclusion as the country moves towards its Viksit Bharat vision. SBI Chairman C S Setty highlighted the bank’s focus on technology-led banking, artificial intelligence, cybersecurity, and digital infrastructure while continuing to strengthen its physical branch network. The lender also plans to expand digital onboarding, transaction banking, SME-focused services, and wealth management offerings as part of its next phase of transformation.Read more

cover photo

Maharashtra waives INR 637 crore stamp duty for New Nagpur Business District and Outer Ring Road projects

29 May 2026

The Maharashtra cabinet has approved a waiver of nearly INR 637 crore in stamp duty and registration charges for land transactions linked to the New Nagpur Business District and New Outer Ring Road projects. The move is aimed at speeding up land acquisition through direct purchases and negotiated settlements with landowners. The New Nagpur Business District, planned over 692 hectares in Hingna taluka, will include an International Business and Finance Centre, while the proposed 148-km Outer Ring Road is expected to improve logistics and regional connectivity around Nagpur through multiple highway links and transport terminals.Read more

cover photo

Rise Infraventures revenue jumps 46% to INR 120 crore in FY26 on strong Gurugram real estate demand

29 May 2026

• Rise Infraventures reported a 46% rise in revenue to INR 120 crore in FY26 from INR 82 crore in the previous fiscal.
• The company facilitated property transactions worth INR 4,840 crore during the fiscal, compared to INR 3,856 crore in FY25.
• Gurugram contributed more than 50% of the company’s total transaction value, driven by strong residential and commercial real estate demand.
• The real estate consultancy plans to expand into more Indian cities and is also exploring entry into the Dubai market.
• Rise Infraventures has set a revenue target of INR 200 crore for the current fiscal while also planning to expand its service portfolio.
Read more

cover photo

Residents seek extension of proposed Kirti Nagar–Palam metro corridor to Dwarka Expressway amid rising congestion concerns

Gurugram News Desk

29 May 2026

• Residents’ groups have sought extension of the proposed Kirti Nagar–Palam metro corridor up to Dwarka Expressway.
• The demand follows approval of the 9.9-km metro line connecting Kirti Nagar and Palam in Delhi.
• Civic groups cited rising congestion and inadequate public transport between Dwarka and Gurugram.
• Stakeholders said the extension could improve connectivity for rapidly developing residential sectors along the corridor.
Read more

cover photo

Nagpur’s Ajni cable-stayed bridge project misses another deadline as key work remains incomplete

29 May 2026

The INR 332 crore Ajni cable-stayed bridge project in Nagpur is set to miss its pre-monsoon completion target, with major structural work still pending. The project, being developed by Maharashtra Rail Infrastructure Development Corporation (MRIDC), is aimed at replacing the 125-year-old Ajni railway overbridge and easing traffic congestion between South and Central Nagpur. Although work on major supports and slab casting has progressed, construction of the central pylon and other engineering components is still underway. The project has already faced multiple deadline revisions due to design changes, approval delays and technical challenges linked to construction over an active railway corridor.Read more

cover photo

Haryana to deploy electric buses and stricter vehicle norms to curb NCR air pollution

29 May 2026

Haryana has announced a wider technology-led pollution control plan for the National Capital Region (NCR), focusing on electric mobility, industrial emission monitoring and stricter checks on polluting vehicles. The state plans to introduce 925 electric buses across key cities including Gurugram and Faridabad while implementing a “No PUCC, No Fuel” policy from October 1, 2026. Authorities are also expanding air quality monitoring infrastructure, linking industrial units with real-time emission tracking systems and increasing enforcement against end-of-life vehicles. The move comes as NCR states continue facing pressure to strengthen long-term clean air measures beyond seasonal restrictions.Read more

cover photo

Prayagraj Municipal Corporation to launch OTS scheme with a major house tax relief for property owners

28 May 2026

• Prayagraj Municipal Corporation (PMC) is preparing to introduce a One-Time Settlement (OTS) scheme for pending house tax dues in June.
• More than 90,000 residential and commercial property owners are expected to benefit from relief on accumulated interest payments.
• The civic body is aiming to improve property tax recovery while reducing financial pressure on taxpayers with old dues.
• The move follows PMC’s recent decision to offer up to 40% house tax rebate for self-occupied residential buildings older than 20 years.
• The scheme comes as the corporation looks to strengthen local revenue collection amid rising civic infrastructure and water supply expenses.
Read more

cover photo

Developers report 25% jump in construction costs amid global supply disruptions

28 May 2026

• Real estate developers have reported a sharp increase in construction costs since global geopolitical conflicts disrupted commodity and supply markets.
• Rising prices of steel, cement, fuel, logistics and imported materials are increasing pressure on project execution and development expenses.
• Industry stakeholders have also flagged concerns over labour shortages, procurement delays and potential impact on housing affordability and project timelines.
Read more

cover photo

Indian Railways to reissue bids for INR 946 crore Vijayawada railway station redevelopment

28 May 2026

• Indian Railways will float fresh bids for the INR 946 crore redevelopment of Vijayawada railway station after limited participation in the earlier tender process.
• The project is part of the Amrit Bharat Station Scheme focused on upgrading major railway stations with modern passenger facilities and commercial infrastructure.
• Vijayawada Junction, one of India’s busiest railway hubs, is planned to be redeveloped with new concourses, better connectivity, upgraded platforms, parking and passenger amenities.
• Railway authorities are expected to revise tender conditions to attract stronger investor and developer interest in the large-scale station project.
• The redevelopment is expected to support passenger growth, improve traffic movement and strengthen railway infrastructure in Andhra Pradesh.
Read more

cover photo

Telangana government caps excess HAM road bids at 5% for INR 13,000 crore highway projects

28 May 2026

The Telangana government has revised tender rules for its Hybrid Annuity Model (HAM) road projects by capping excess bids at 5% above estimated project costs. The move applies to road development works worth nearly INR 13,000 crore and is aimed at improving cost control, transparency and faster execution. The state is currently implementing hundreds of road projects across districts under the HAM model to improve connectivity and support industrial growth. Officials said the revised norms would help avoid inflated quotations while maintaining contractor participation amid rising construction costs, including higher bitumen, fuel and material prices.Read more

cover photo

B J Medical College hostel to be rebuilt at crash-affected site amid memorial demand

Ahmedabad News Desk

28 May 2026

The Gujarat government has announced the reconstruction of the hostel complex of B J Medical College in Ahmedabad, which was severely damaged in a previous Air India crash at the site. The state plans to develop a modern facility at an estimated cost of INR 105 crore, with support from Tata Group, which has agreed to contribute INR 53.12 crore for the damage. However, families of victims have requested that the location be preserved as a memorial space for reflection and remembrance, seeking consultation before any final redevelopment decisions are taken.Read more

cover photo

ONGC board clears Dahej liquid port joint venture with GMB, reports lower full-year standalone profit

28 May 2026

• ONGC's board met on 26 May 2026 in New Delhi, approving an in-principle 50:50 joint venture with Gujarat Maritime Board to develop a 5 MMTPA liquid port at Dahej, Gujarat, pending DIPAM and partner approvals.
• Standalone net profit for FY 2025–26 stood at INR 32,894 crore, down from INR 35,610 crore the previous year; consolidated net profit rose to INR 49,793 crore.
• A final dividend of INR 1 per share was recommended, and a USD 325 million abandonment liability guarantee for the BC-10 block in Brazil was approved.
Read more

cover photo

Supreme Court rejects Tamil Nadu’s review petition against Mekedatu reservoir project

28 May 2026

• The Supreme Court has dismissed Tamil Nadu’s review petition opposing Karnataka’s proposed Mekedatu balancing reservoir project on the Cauvery river.
• Karnataka stated that it would continue work on the project’s revised Detailed Project Report (DPR) following the court’s decision.
• Tamil Nadu has maintained that the project could impact downstream water availability and affect existing Cauvery water-sharing arrangements.
Read more

cover photo

Maharashtra government backs Worli jetty redevelopment with helipad and water transport plans

28 May 2026

The Maharashtra government has accelerated plans for redevelopment of the Worli jetty in Mumbai, with proposals for a helipad, water transport integration and emergency service infrastructure at the Coastal Road site. The project is being coordinated between the Brihanmumbai Municipal Corporation (BMC), Maharashtra Maritime Board (MMB) and other state agencies. Authorities are evaluating long-term public use of the temporary jetties constructed during the Mumbai Coastal Road project, including passenger water transport, medical emergency services and coastal connectivity infrastructure.Read more

cover photo

PVV Infra eyes 13 NHAI wayside amenities projects on major highway corridors

28 May 2026

PVV Infra is expanding its presence in India’s highway infrastructure sector with plans to pursue 13 National Highways Authority of India (NHAI) wayside amenities projects across key road corridors. The company has already bid for projects on the Gwalior-Jhansi stretch and near Ujjain, while more bids are being prepared for the Delhi-Dehradun corridor. The proposed developments will include fuel stations, EV charging points, food courts, truck terminals, retail spaces and rest facilities. The move comes as NHAI continues to push organised highway infrastructure to support rising traffic movement, logistics demand and long-distance travel across the country.Read more

cover photo

Brisbane stadium protests continue as eviction deadline approaches for Victoria Park works

28 May 2026

A group of environmental activists and Indigenous Australian campaigners are continuing their protest at Victoria Park in Brisbane, where a new stadium for the 2032 Olympics is planned. The Queensland state government has set a Monday deadline for the site to be vacated, with fencing and preparatory construction works already beginning. Aboriginal elders and supporters argue the park holds deep cultural and spiritual importance, while authorities maintain that the project cannot be delayed. Legal and environmental concerns around the site remain unresolved as tensions grow ahead of construction.Read more

cover photo

DMRC strengthens last-mile connectivity across Delhi-NCR with integrated mobility solutions

28 May 2026

• Delhi Metro Rail Corporation (DMRC) is expanding last-mile connectivity services across Delhi-NCR through integrated mobility solutions linked with metro stations.
• The initiative includes bike taxis, auto-rickshaws and cab services integrated with metro travel through digital platforms and mobile applications.
• DMRC has partnered with Sahkar Taxi Cooperative Ltd. to improve first- and last-mile transport access for daily commuters.
• Additional metro train trips and station connectivity upgrades are also being introduced to improve commuter movement and reduce dependence on private vehicles.
• The move is part of DMRC’s broader focus on sustainable urban transport, multimodal connectivity and improved public transport usage in Delhi-NCR.
Read more

cover photo