SBI Term Loan: RLLR: 8.15 | 7.25% - 8.45%
Canara Bank: RLLR: 8 | 7.15% - 10%
ICICI Bank: RLLR: -- | 8.5% - 9.65%
Punjab & Sind Bank: RLLR: 7.3 | 7.3% - 10.7%
Bank of Baroda: RLLR: 7.9 | 7.2% - 8.95%
Federal Bank: RLLR: -- | 8.75% - 10%
IndusInd Bank: RLLR: -- | 7.5% - 9.75%
Bank of Maharashtra: RLLR: 8.05 | 7.1% - 9.15%
Yes Bank: RLLR: -- | 7.4% - 10.54%
Karur Vysya Bank: RLLR: 8.8 | 8.5% - 10.65%

Infrastructure News

Odisha lines up INR 12,102 crore highway expansion push as 49 completed road projects await inauguration

1 hour ago

• Odisha is preparing to launch 47 national highway projects worth INR 12,102 crore after completing 49 road infrastructure projects valued at INR 1,721 crore.
• The upcoming projects include bypasses, bridges and corridor upgrades aimed at improving regional and inter-district connectivity.
• A state-level review assessed the status of ongoing, tender-stage and pending highway works to accelerate implementation timelines.
• The planned investments form part of a broader effort to strengthen Odisha's transport network and support economic growth through improved road infrastructure.
Read more

cover photo

Mumbai’s Mrinaltai Gore flyover extension set to open, easing Goregaon traffic

3 hours ago

• The extended section of the Mrinaltai Gore flyover in Mumbai is set to open on June 6, improving connectivity in the western suburbs.
• The project aims to streamline traffic movement in Goregaon and reduce congestion on key arterial routes.
• Officials expect significant reduction in travel time for commuters using the upgraded corridor.
• The upgraded infrastructure is also expected to ease peak-hour bottlenecks by diverting vehicular load from surrounding internal roads.
Read more

cover photo

Lucknow sanctions 48 road projects worth INR 11.66 crore in Sarojini Nagar to improve connectivity

Lucknow News Desk

5 hours ago

The Lucknow administration has approved 48 road construction and strengthening projects worth INR 11.66 crore in Sarojini Nagar under the Chief Minister Rapid Road Development Scheme. The works will cover nearly 10 km of internal and connecting roads across the constituency, aimed at improving local connectivity and easing commuter movement. The initiative also includes ongoing civic upgrades such as improved street lighting and infrastructure strengthening in several villages. Officials said the projects have been launched in phases to enhance road quality and address long-pending connectivity gaps in the area.Read more

cover photo

KPIL Strengthens Order Book with INR2,002 Crore in Fresh Infrastructure Contracts

6 hours ago

• KPIL and its international subsidiaries have secured new orders worth approximately INR 2,002 crore across power transmission & distribution, buildings & factories, and railways businesses.
• The contracts include overseas T&D projects, repeat orders in the construction segment and a metro rail-related railway project in India.
• The latest wins strengthen KPIL’s presence in key international markets while reinforcing its position across core infrastructure sectors and supporting future growth visibility.
Read more

cover photo

DIAL set to finalise 20-year master plan for Delhi airport as passenger growth drives next phase of expansion

8 hours ago

Delhi International Airport Limited (DIAL) is expected to finalise a new 20-year master plan for Indira Gandhi International Airport (IGIA) within the next two to two-and-a-half months, outlining the airport’s long-term infrastructure and operational strategy. The plan will account for evolving airline business models, changing market dynamics, passenger growth and future infrastructure requirements. The development comes as IGIA, India’s busiest airport, handled 78.7 million passengers during FY 2025-26 and continues to prepare for future capacity expansion. The master plan is expected to address terminal development, airside infrastructure and operational requirements while supporting Delhi’s ambition to strengthen its position as a major aviation hub amid increasing competition and changing traffic patterns.Read more

cover photo

Trichy–Karaikudi highway four-laning revived with proposal for two elevated corridors to ease traffic bottlenecks

9 hours ago

• The long-pending four-laning of the Trichy–Karaikudi National Highway has been revived, with updated planning incorporating elevated corridor sections at critical congestion points.
• The project aims to upgrade the existing two-lane highway into a four-lane standard to improve regional connectivity in central Tamil Nadu.
• Detailed Project Report (DPR) preparation has reached an advanced stage, with alignment refinement and engineering studies underway for key stretches.
• The proposal includes two elevated corridors designed to bypass high-density traffic zones and improve safety and travel efficiency along the corridor.
Read more

cover photo

Missing road links continue to force long detours for Vatika commuters in Gurugram

11 hours ago

• Residents of Vatika India Next and nearby sectors continue to face a nearly seven-kilometre detour to access the Dwarka Expressway due to two incomplete road links.
• The missing connections are linked to land acquisition, right-of-way constraints and pending infrastructure works across sectors in New Gurugram.
• GMDA records show that one link could not proceed because land was not handed over, while another required realignment owing to site constraints.
Read more

cover photo

Varanasi’s Dalmandi Transformation Picks Up Speed as 112 Buildings Make Way for Major Road Widening Project

14 hours ago

• The Dalmandi road widening project in Varanasi has gained momentum, with 112 buildings demolished so far as part of a major infrastructure upgrade.
• The project aims to widen the congested 650-metre stretch connecting Naisadak and Chowk, improving access to the Kashi Vishwanath Dham corridor.
• Nearly 187 properties have been identified for acquisition and demolition under the project, which carries an estimated cost of around INR 224 crore.
• Authorities have completed compensation and acquisition procedures for several affected property owners, allowing demolition work to progress.
• The redevelopment is expected to ease congestion, improve pedestrian movement and strengthen connectivity within Varanasi's historic commercial district.
Read more

cover photo

Solapur–Hassan Express gets new halt at Channarayapatna, improving rail connectivity in Hassan district

16 hours ago

• The Ministry of Railways has approved a new stoppage for the Solapur–Hassan Express at Channarayapatna railway station in Karnataka's Hassan district.
• The halt addresses a long-pending demand from local residents and is expected to improve connectivity to Channarayapatna and the nearby pilgrimage centre of Shravanabelagola.
• The announcement was made by Union Minister of State for Railways and Jal Shakti V. Somanna during a South Western Railway programme.
• Railway infrastructure projects, including station redevelopment works in Hassan, Arsikere and Sakleshpur, are also progressing under ongoing modernization initiatives.
• The move is expected to benefit daily commuters, pilgrims and regional travellers while strengthening rail access across the district.
Read more

cover photo

Fly ash brick price hike in Madhya Pradesh raises construction cost concerns

18 hours ago

• Madhya Pradesh is witnessing a sharp rise in fly ash brick prices, increasing input costs for housing and construction projects.
• Developers have raised concerns over the impact on project budgets and residential construction expenses.
• Industry stakeholders said the increase could eventually affect homebuyers through higher property costs.
• The issue has intensified concerns over rising material prices amid ongoing residential and infrastructure development across the state.
Read more

cover photo