SBI Term Loan: RLLR: 8.15 | 7.25% - 8.45%
Canara Bank: RLLR: 8 | 7.15% - 10%
ICICI Bank: RLLR: -- | 8.5% - 9.65%
Punjab & Sind Bank: RLLR: 7.3 | 7.3% - 10.7%
Bank of Baroda: RLLR: 7.9 | 7.2% - 8.95%
Federal Bank: RLLR: -- | 8.75% - 10%
IndusInd Bank: RLLR: -- | 7.5% - 9.75%
Bank of Maharashtra: RLLR: 8.05 | 7.1% - 9.15%
Yes Bank: RLLR: -- | 7.4% - 10.54%
Karur Vysya Bank: RLLR: 8.8 | 8.5% - 10.65%

Location : Mumbai City

BMC revises smart parking framework, to reissue Mumbai-wide PPP tender

Mumbai News Desk

03 Jun 2026

The Brihanmumbai Municipal Corporation (BMC) is set to reissue its tender for a city-wide smart parking system after the earlier bidding process failed to attract suitable participants. Revised conditions include the removal of property tax liabilities for operators of public parking facilities and changes to financial eligibility norms. The PPP-based project aims to introduce an integrated digital parking network across Mumbai, incorporating real-time occupancy tracking, online reservations, sensors, video analytics and automated access systems to improve parking management.Read more

cover photo

Chembur Metro station receives safety clearance, paving way for Metro–Monorail interchange

Mumbai News Desk

03 Jun 2026

The Chembur station on Mumbai Metro Line 2B has received safety clearance from the Commissioner of Metro Rail Safety (CMRS), clearing a key hurdle for operationalising the long-awaited Metro–Monorail interchange in eastern Mumbai. The approval is expected to facilitate seamless transfers between Metro Line 2B, the Mumbai Monorail and the suburban rail network, strengthening multimodal connectivity in the Chembur area. The development comes after a series of inspections, safety audits and integration works undertaken by project authorities, with the interchange expected to improve accessibility and support higher ridership across the corridor.Read more

cover photo

Marine Lines station foot overbridge work advances with launch of 19 steel girders during major rail block

Mumbai News Desk

03 Jun 2026

• Western Railway has completed the launch of 19 steel girders for a new 12-metre-wide foot overbridge at Marine Lines station as part of station upgrade works.
• The operation was carried out during a scheduled overnight traffic and power block using heavy lifting equipment and a large workforce to minimise disruption to suburban services.
• The new bridge is expected to improve passenger circulation, reduce congestion on platforms and enhance commuter safety at one of Mumbai’s busiest suburban stations.
Read more

cover photo

Mahindra BeaconHill

03 Jun 2026

Mumbai City, India

Mahindra BeaconHill is an ultra-premium 58-storey luxury residential tower by Mahindra Lifespaces in Agripada, Mahalaxmi, South Mumbai, offering 3, 3.5 & 4 BHK homes priced from INR 6.30 Cr across 1.68 acres. It features signature rooftop lounge with panoramic city and sea views, and is strategically located near Eastern Express Highway (800m) and Coastal Road (3km).

View Website | Visit RERA website

cover photo

BMC’s INR 1,000 crore maiden green bond issue attracts bids from 13 institutions

Mumbai News Desk

02 Jun 2026

• The Brihanmumbai Municipal Corporation (BMC) has received interest from 13 institutions for its maiden INR 1,000 crore green bond issuance process.
• The current stage involves selection of a merchant banker to structure and manage the proposed bond issue.
• The green bond is expected to finance environment-focused urban infrastructure projects in Mumbai, strengthening sustainable financing frameworks for civic development.
• The strong participation indicates institutional confidence in municipal bond-led funding mechanisms as urban local bodies explore diversified capital-raising avenues.
• The initiative marks a key step in BMC’s efforts to tap capital markets for infrastructure development.
Read more

cover photo

BMC demolishes 150 structures in Mulund for GMLR project as residents allege rehabilitation survey lapses

Mumbai News Desk

02 Jun 2026

The Brihanmumbai Municipal Corporation (BMC) demolished around 150 residential and commercial structures in Mulund’s Amar Nagar and Khindipada areas to clear land for the Goregaon-Mulund Link Road (GMLR) project. Civic authorities said the action followed a rehabilitation survey conducted in 2022, under which eligible residents were allotted rehabilitation flats in Kanjurmarg. Several affected residents, however, alleged errors in the eligibility survey and claimed they were excluded from rehabilitation benefits despite residing in the area for years.Read more

cover photo

MHADA identifies 82 dangerous buildings in Mumbai ahead of monsoon, issues evacuation and safety notices

Mumbai News Desk

02 Jun 2026

• The Maharashtra Housing and Area Development Authority (MHADA) has identified 82 buildings across Mumbai as highly dangerous ahead of the monsoon season and has initiated precautionary measures for resident safety.
• The structures have been categorised under the ‘C-1’ classification, indicating that they are unsafe for habitation and require evacuation or demolition.
• Notices have been issued to residents and occupants, while coordination has been initiated with civic authorities, police and disaster management agencies.
• The exercise forms part of Mumbai’s annual pre-monsoon structural safety review aimed at reducing risks associated with ageing and dilapidated buildings.
• Authorities have urged occupants to vacate unsafe premises as heavy rainfall conditions are expected to increase structural vulnerability during the monsoon months.
Read more

cover photo

Mumbai identifies 19 large slum clusters for redevelopment under new 50-acre integrated housing policy

02 Jun 2026

Mumbai’s Slum Rehabilitation Authority (SRA) has identified 19 large slum clusters across the city for redevelopment under Maharashtra’s newly introduced cluster redevelopment policy for plots exceeding 50 acres. The projects include major sites in Andheri West, Govandi, Mankhurd, Wadala and Vikhroli, with the largest covering nearly 100 acres near Gilbert Hill in Andheri. The scheme aims to integrate slums, old buildings and unusable land parcels into large-scale redevelopment projects through joint ventures, tenders and government-led implementation models.Read more

cover photo

Coastal housing markets witness shortage of 3BHK apartments as larger homes drive residential demand

Mumbai News Desk

02 Jun 2026

• Residential markets across several coastal cities are witnessing a shortage of ready and under-construction 3BHK apartments amid sustained demand for larger homes.
• Developers and property consultants have reported rising preference for spacious residences among end-users, particularly in premium and upper mid-segment housing projects.
• Demand has been driven by changing household requirements, hybrid work patterns and growing preference for lifestyle-oriented residential developments.
• Limited availability of suitably configured units has led developers to recalibrate project launches towards larger apartment formats in key coastal markets.
• The trend is being observed across major coastal real estate destinations where housing demand has remained resilient despite rising property prices and construction costs.
Read more

cover photo

Aging Girgaon residents face worsening water shortages amid redevelopment pressure

02 Jun 2026

Residents of Parijat Sadan, a nearly five-storey cessed building in Girgaon, Mumbai, have continued to face severe water shortages and low water pressure for more than a year despite repeated complaints to civic authorities. The Brihanmumbai Municipal Corporation (BMC) had earlier recommended replacement and expansion of the building’s water pipeline, while the Maharashtra Housing and Area Development Authority (MHADA) stated that approvals for the proposed work remain pending. Residents alleged that rapid redevelopment and the emergence of high-rise towers in the locality have worsened water distribution for older buildings dependent on ageing infrastructure. The issue has disrupted daily routines for over 40 families, with residents claiming that intermittent water supply and weak pressure have particularly affected senior citizens living in the building.Read more

cover photo

Mahindra Rainforest Phase 2

02 Jun 2026

Mumbai City, India

Mahindra Rainforest Phase 2 is a premium residential project in Bhandup West, Mumbai, offering spacious 2 & 3 BHK apartments with lush green surroundings, modern amenities like swimming pool, gym, clubhouse, and 24/7 security. Located near Bhandup station with excellent connectivity to Eastern Express Highway and Lokmanya Tilak Terminus, it provides a serene eco-friendly lifestyle with possession already completed and ready-to-move-in options.

View Website | Visit RERA website

cover photo

BMC to impose INR 3 crore penalty on contractor after two worker deaths at Mumbai Coastal Road Phase 2 site

01 Jun 2026

• The BMC will impose an INR 3 crore penalty on contractor Larsen & Toubro after two workers died at a Coastal Road Phase 2 casting yard.
• The accident occurred earlier this month at a gantry crane platform in Bhayander West linked to the Mumbai Coastal Road project.
• A probe by VJTI identified multiple safety lapses, including inadequate structural support and insufficient safety systems.
• Civic authorities have ordered corrective measures and initiated wider safety audits across project construction sites.
Read more

cover photo

Mumbai records highest May property registrations in 14 years as housing demand remains firm

01 Jun 2026

• Property registrations within the Brihanmumbai Municipal Corporation (BMC) area reached 12,403 units in May 2026, according to data from Maharashtra’s Department of Registration and Stamps analysed by Knight Frank India.
• Registrations increased 7 per cent year-on-year from 11,565 units recorded in May 2025, although volumes were lower than April 2026’s 14,285 units.
• The figures include transactions across both primary and secondary residential property markets.
• Knight Frank India said May 2026 registered the highest property registration volume for the month of May in the past 14 years, exceeding the previous peak achieved in May 2025.
• Industry stakeholders attributed the performance to sustained end-user demand and continued confidence in Mumbai’s residential housing market despite wider global economic uncertainties.
Read more

cover photo

MMRDA partners with TEAM to strengthen AI and innovation ecosystem across Mumbai Metropolitan Region

01 Jun 2026

• The Mumbai Metropolitan Region Development Authority (MMRDA) has signed a memorandum of understanding (MoU) with the Tech Entrepreneurs Association of Mumbai (TEAM) during Mumbai Tech Week 2026.
• The partnership aims to support the development of a global startup, innovation and artificial intelligence (AI) ecosystem across the Mumbai Metropolitan Region (MMR).
• The collaboration will support initiatives linked to Maharashtra Innovation City and the broader Mumbai 3.0 development programme.
• Planned initiatives include AI job fairs, global capability centres, hackathons, investor engagement platforms and knowledge-sharing programmes based on international best practices.
• The partnership seeks to position MMR as a major destination for technology-driven investment, innovation and entrepreneurship.
Read more

cover photo

26-year-old dies in Khar fire as fundraiser launched for affected family

01 Jun 2026

A 26-year-old man died after a fire engulfed a garage-cum-residence in Mumbai’s Khar area, causing extensive damage to the family’s home and workplace in Chuim Village. The deceased, Adrien Alves, was pursuing chartered accountancy studies while also working at a comic book store in Bandra. The blaze destroyed portions of the residential structure and adjoining garage owned by the family. Following the incident, relatives and local residents launched an online fundraiser to support rebuilding efforts and assist the uninsured family.Read more

cover photo

MahaRERA directs Mumbai developer to address construction defects and complete conveyance process

01 Jun 2026

• MahaRERA has again pulled up a Mumbai-based developer over alleged construction defects and delays in executing conveyance for a residential project.
• The authority directed the builder to undertake repairs and complete conveyance procedures within prescribed timelines.
• Residents had raised concerns regarding workmanship deficiencies, infrastructure-related issues and pending transfer of property rights.
• The order reflects increasing regulatory scrutiny over developer compliance and homebuyer protection in Maharashtra’s housing sector.
• Industry observers note that delayed conveyance and structural defect disputes remain among the most common complaints before MahaRERA.
Read more

cover photo

Opposition questions BMC’s proposed SevenHills Hospital PPP revival plan

01 Jun 2026

• Opposition parties have criticised the Brihanmumbai Municipal Corporation proposal to revive SevenHills Hospital in Andheri through a public-private partnership model involving private operator participation.
• According to civic discussions and multiple media reports, concerns were raised over handing public healthcare land and infrastructure to private entities without adequate transparency or public accountability.
• The proposals related to SevenHills Hospital, blood bank privatisation and associated land-use changes were later referred back by BMC’s improvements committee following political objections and intervention from senior state leaders.
Read more

cover photo

Hirani New Aakanksha CHS

01 Jun 2026

Mumbai City, India

Hirani New Aakanksha CHS is a new launch residential project in Borivali West, Mumbai, offering 1 and 2 BHK apartments. Developed by Hirani Group, the project features modern amenities and is scheduled for possession starting in February 2028.

View Website | Visit RERA website

cover photo

How Infrastructure Upgrades are Driving Commercial Real Estate in Andheri

Mr. Rohit Garodia, Founder and Managing Partner, Pecan Realty.

31 May 2026

Infrastructure development is playing a major role in reshaping Andheri’s commercial real estate market, with improved metro and road connectivity making the suburb more accessible for businesses and employees. The expansion of metro corridors, including Metro Line 6, the Aqua Line, and Metro Lines 2A and 2B, is improving east-west and north-south connectivity across Mumbai. At the same time, projects such as the Mumbai Coastal Road and the Bandra–Versova Sea Link are reducing travel time and easing congestion. These developments are helping Andheri attract sustained office leasing demand, particularly from mid-sized firms and technology-driven businesses seeking efficient and well-connected office locations.Read more

cover photo

Marathon NextGen Realty posts record FY26 profit of INR 206 crore, turns net debt-free after QIP and project expansion

31 May 2026

• Marathon NextGen Realty reported its highest-ever annual profit after tax of INR 206 crore for FY26, supported by strong commercial leasing, collections and project launches.
• The company recorded total income of INR 639 crore and EBITDA of INR 261 crore during the financial year while maintaining a PAT margin of 32%.
• Collections during FY26 stood at INR 781 crore, driven by construction progress across projects including Monte South, Nexzone and Bhandup developments.
• Marathon raised nearly INR 900 crore through a Qualified Institutional Placement and utilised INR 340 crore towards debt repayment, resulting in a positive net cash position.
• The developer also expanded its pipeline through acquisitions in Kanjurmarg and MMR, adding projects with a combined estimated GDV exceeding INR 840 crore.
Read more

cover photo