SBI Term Loan: RLLR: 8.15 | 7.25% - 8.45%
Canara Bank: RLLR: 8 | 7.15% - 10%
ICICI Bank: RLLR: -- | 8.5% - 9.65%
Punjab & Sind Bank: RLLR: 7.3 | 7.3% - 10.7%
Bank of Baroda: RLLR: 7.9 | 7.2% - 8.95%
Federal Bank: RLLR: -- | 8.75% - 10%
IndusInd Bank: RLLR: -- | 7.5% - 9.75%
Bank of Maharashtra: RLLR: 8.05 | 7.1% - 9.15%
Yes Bank: RLLR: -- | 7.4% - 10.54%
Karur Vysya Bank: RLLR: 8.8 | 8.5% - 10.65%

Coimbatore Airport expansion begins with INR 29 crore boundary wall tender by AAI

#Infrastructure News#India#Tamil Nadu#Coimbatore
Last Updated : 28th Mar, 2025
Synopsis

The Airports Authority of India (AAI) has initiated the next step in Coimbatore airport's expansion by issuing a tender worth INR 29 crore to construct a 16.7 km precast boundary wall, with completion expected in 456 days. The tentative master plan outlines a two-phase project featuring a new passenger terminal with 20 aerobridges, a cargo terminal, an air traffic control-cum-technical building, and an extended runway from 2,990 to 3,810 meters. Additional facilities will include a bus stand, multilevel parking, a new approach road, and three hotels. Passenger capacity is projected to surge from 3.63 million to 15 million annually by 2030, with daily flights increasing from 33 to 60. Minor modifications to the plan are underway to address structural considerations.

Have something to say? Post your comment