SBI Term Loan: RLLR: 8.15 | 7.25% - 8.45%
Canara Bank: RLLR: 8 | 7.15% - 10%
ICICI Bank: RLLR: -- | 8.5% - 9.65%
Punjab & Sind Bank: RLLR: 7.3 | 7.3% - 10.7%
Bank of Baroda: RLLR: 7.9 | 7.2% - 8.95%
Federal Bank: RLLR: -- | 8.75% - 10%
IndusInd Bank: RLLR: -- | 7.5% - 9.75%
Bank of Maharashtra: RLLR: 8.05 | 7.1% - 9.15%
Yes Bank: RLLR: -- | 7.4% - 10.54%
Karur Vysya Bank: RLLR: 8.8 | 8.5% - 10.65%

Infrastructure

Gorakhpur expressway launch marks next phase in UP�s highway expansion drive

01 Jan 1970

Uttar Pradesh has operationalised the Gorakhpur Link Expressway, its seventh expressway, developed at an investment of INR 7,283 crore. This 91.35 km stretch links Gorakhpur to districts including Azamgarh and significantly strengthens the state's share in India�s expressway network, raising it from 38% to 42%. With over 1,200 km of access-controlled expressways now within its borders, UP leads nationally. The expressway was built partly on land acquired from 22,000 farmers and is projected to transform the socio-economic fabric of the Purvanchal region.Read more

cover photo

Hyderabad airport begins expansion to handle rising passenger and cargo traffic

01 Jan 1970

GMR Hyderabad International Airport Ltd (GHIAL) has launched a INR 5,843 crore expansion at Rajiv Gandhi International Airport to meet rising traffic. The plan includes a new 225,000 sq. m terminal primarily for domestic use, a 3,800-meter runway for low-visibility operations, and a 650-meter cross taxiway for wide-body aircraft. Aircraft stands will increase to 163 and parking bays to 5,590. A second cargo terminal (50,000 MT capacity) costing INR 160 crore is set to open by July. The existing terminal is also being expanded at INR 427 crore. A 31-km metro line from Mindspace to the airport is planned to boost access, with GHIAL supporting the initiative. AERA will determine revised tariffs.Read more

cover photo