19 May 2025
The ongoing redevelopment of Tilak Bridge in Mumbai's Dadar area has caused major traffic congestion, frustrating thousands of daily commuters. As the Brihanmumbai Municipal Corporation (BMC) carries out the phased construction of a new parallel bridge, the existing structure remains a bottleneck. Local residents and transport experts say the situation has worsened due to encroachments, narrow lanes, and poor planning. With Phase 1 now underway, the old bridge will be demolished only after the new one is operational. The complete project is expected to finish by 2026. Meanwhile, commuting through this busy area remains a daily challenge for many.Read more
16 May 2025
Maharashtra Deputy Chief Minister Shri Devendra Fadnavis inaugurated two major road-over-bridges (ROBs) on May 14 - a 273-crore cable-stayed Reay Road ROB in Mumbai and another in Titwala. These projects are designed to improve east-west connectivity and ease traffic congestion in high-density suburban areas. The Reay Road ROB is the first cable-stayed overbridge in suburban Mumbai, while the Titwala bridge connects Ambivli to Kalyan and serves over 25,000 daily rail passengers. Funded by MahaRail and the state government, both bridges aim to reduce commute times and traffic jams, with better infrastructure for vehicles and pedestrians during peak hours.Read more
15 May 2025
The Maharashtra Housing and Area Development Authority (MHADA) has intensified efforts to redevelop the 13,091 cessed buildings in Mumbai's island city. In response to the deteriorating condition of these structures, MHADA has initiated structural inspections and launched an awareness campaign to inform societies about the redevelopment process. The government has amended Section 79A of the MHADA Act, 1976, allowing landowners the first opportunity to submit a redevelopment proposal with the irrevocable consent of 51% of tenants/residents. If no proposal is submitted, MHADA's Mumbai Building Repair and Reconstruction Board (MBRRB) can acquire the building and land to carry out the redevelopment process.Read more
15 May 2025
The Brihanmumbai Municipal Corporation (BMC) demolished five unapproved multi-story structures that were built inside the Coastal Regulation Zone (CRZ) in Versova earlier this week. These structures, erected over the past year without municipal approval, posed significant environmental and safety risks. The BMC utilized heavy machinery and deployed a substantial workforce to dismantle the buildings. Furthermore, the civic body identified an additional 35 illegal constructions in the area, planning further action in the coming days.Read more
15 May 2025
Mumbai Metro Line 9, extending from Dahisar to Mira Road, is gearing up for trial runs as construction work approaches completion. The 11 km corridor, which includes a 5 km elevated section, is designed to integrate with Metro Line 7, aiming to reduce travel time between Colaba and Mira Road to approximately 90 minutes. The Mumbai Metropolitan Region Development Authority (MMRDA) has reported that nearly 85% of the work has been completed, with essential infrastructure and electrification nearing final stages. Once operational, the line is expected to significantly alleviate traffic congestion, enhance public transport connectivity, and provide a reliable commuting option for daily passengers in the western suburbs.Read more
15 May 2025
The Brihanmumbai Municipal Corporation (BMC) has sanctioned a project valued at INR 62 crore to construct a state-of-the-art tunnel aquarium at the Veermata Jijabai Bhosale Udyan and Zoo in Byculla. The contract has been awarded to M/S Marine Aqua Zoo, known for its expertise in marine-themed projects. The 14,000 sq ft structure will feature a walk-through tunnel and multiple thematic tanks, showcasing over 200 marine species. Expected to be completed by early 2027, the project is part of BMC's broader strategy to revitalise the 160-year-old zoo, attracting more visitors, particularly children and tourists.Read more
15 May 2025
The Navi Mumbai Municipal Corporation (NMMC) has encouraged property owners to complete the Know Your Customer (KYC) process to facilitate easier access to digital municipal services. This initiative is designed to enable residents to conveniently view and pay property tax bills via mobile phones while also receiving essential updates, including water supply alerts, emergency notifications, heavy rainfall warnings, and traffic advisories. Property owners can complete the KYC process by visiting the NMMC's official website and accessing the QR code or link provided. This effort is part of NMMC's broader digital transformation strategy aimed at enhancing service delivery and citizen engagement.Read more
15 May 2025
ILP 4 India 1 Pvt Ltd has acquired a 3.95-acre land parcel in Kurla, Mumbai, for INR 193.5 crore from Shri Aditya Finwealth, according to real estate consultancy Square Yards. Registered in May 2025, the deal includes existing structures with a built-up area of 4,519 sq m and involved a stamp duty of INR 11.61 crore. The land is designated for industrial use under Development Plan 2034, making it suitable for warehousing or logistics projects. This acquisition highlights Kurla's growing appeal for industrial investment and reflects ILP 4 India's ongoing expansion in real estate development.Read more
14 May 2025
The Bombay High Court has ordered a land survey in Powai to investigate allegations of unauthorised encroachments on property owned by IIT Bombay. The directive was issued in response to a PIL that accused contractors of illegally seizing land and constructing slum tenements, allegedly using criminal intimidation to force residents out. The court has instructed the Mumbai Suburban District Collector to conduct the survey and submit a detailed report, ensuring that both the institute and the accused have an opportunity to present their claims. The court also mandated police protection during the removal of encroachments.Read more
14 May 2025
The Airport Economic Regulatory Authority (AERA) has approved a revised User Development Fee (UDF) structure for Mumbai airport, effective April 2024 to March 2029. Domestic passengers will now pay INR 275-304, while international passengers will pay INR 830-875, with higher rates for business class. A separate INR 175 levy will apply to all arriving passengers. AERA also directed Mumbai International Airport Ltd (MIAL) to revise its Terminal-1 demolition schedule, favoring a phased transition to avoid disruption. While MIAL had sought a 67% UDF hike, AERA approved only a 21.6% increase, emphasizing affordability and operational efficiency for both passengers and airlines.Read more
14 May 2025
Bollywood actress Amrita Puri, along with her parents Aditya and Anita Puri, has acquired a luxury apartment in the prestigious Lower Parel area of Mumbai for INR 37 crore. The 5,446.53 sq ft property is situated on the 49th floor of Lodha Group's World One tower, a part of the lavish World Towers development. The transaction, which was officially registered earlier this year, included a stamp duty of INR 2.22 crore and additional registration charges. The family also secured four dedicated car parking spaces with the purchase.Read more
14 May 2025
Maharashtra Chief Minister Shri Devendra Fadnavis and Deputy CM Shri Eknath Shinde recently inaugurated Phase 2 of Mumbai Metro Line 3, a 9.6 km underground stretch from Worli's Acharya Atre Chowk to Bandra Kurla Complex (BKC). This brings the operational corridor to 20 km, improving north-south connectivity between Aarey and Worli. Covering key locations like Dharavi, Dadar, Mahim, and Siddhivinayak Temple, the expansion is expected to boost real estate activity in surrounding areas. Analysts predict a 1.5-2x rise in annual office leasing in CBDs like BKC and Worli. The final phase to Cuffe Parade will further enhance Mumbai's transit integration and urban growth.Read more
14 May 2025
L&T Realty has made its first outright land purchase with the acquisition of a 34-acre plot in Panvel, Navi Mumbai, for over INR 102 crore from three landowners. Marking a strategic shift from its usual joint ventures and development agreements, the move strengthens the company's footprint in Navi Mumbai. The land, currently zoned for industrial use, has sparked speculation on whether it will be used for residential development or as a precast manufacturing facility. This follows L&T Realty's recent JV at Bandra Reclamation and a major redevelopment project in Thane, reinforcing its expansion strategy across high-growth urban regions.Read more
14 May 2025
After enduring seven years of partial closures, delays, and detours, commuters in Mumbai can now access the fully reopened Gokhale Bridge in Andheri, marking a crucial step in restoring the east-west corridor. The INR 90 crore reconstruction project, which faced repeated setbacks due to coordination challenges between the BMC and Western Railways, has now been completed with two operational lanes in each direction. Civic engineers and local groups have expressed relief at the long-awaited reopening.Read more
13 May 2025
The Bombay High Court has permitted the BMC to construct a 50-metre-wide road through mangrove buffer zones in Malad West, citing compliance with environmental regulations and public necessity. The project, affecting 3.5 hectares and 37 mangrove trees, had received clearances from both the MCZMA and the Ministry of Environment. The court referred to a 2018 Supreme Court ruling that allowed such projects if proposed before the order and with due approvals. With legal and environmental approvals in place, the BMC is now set to proceed with the long-pending infrastructure work aimed at improving connectivity while implementing mitigation measures to limit ecological damage.Read more
13 May 2025
The Charkop elevated road bridge project, aimed at improving east-west connectivity in Mumbai's western suburbs, has had its completion deadline extended to June 2027, according to MMRDA. Originally slated for end-2025, the 3.4-km bridge connecting Malvani and Charkop faced delays due to design changes and utility relocation challenges. Executed by J Kumar Infraprojects at a cost of INR 620.15 crore, the project required revisions to align with existing infrastructure and safely shift underground utilities. Once complete, the bridge is expected to ease congestion on Link Road and improve travel times for thousands of commuters between Borivali and Malad.Read more